CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-20/
normalized-primes-20-40-2-5.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-20/
normalized-primes-20-40-2-5.xml
MD5SUM1d0ec9b951acb97acb31ad54520f8b89
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.025995
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints40
Maximum constraint arity7
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension40
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2070710SAT 0.025995 0.0342341
bpsolver 09 (complete)2070711SAT 0.051991 0.0579411
Choco2.1.1 2009-06-10 (complete)2070706SAT 0.975851 0.996759
Choco2.1.1b 2009-07-16 (complete)2115664SAT 1.03284 1.06957
Abscon 112v4 AC (complete)2095505SAT 8.09377 8.22372
Abscon 112v4 ESAC (complete)2095506SAT 10.2534 10.3708
pcs 0.3.2 (complete)2070702SAT 1010.63 1024.16
SAT4J CSP 2.1.1 (complete)2070701? 223.53 222.526
Sugar v1.14.6+minisat (complete)2070708? 266.676 926.84
Sugar v1.14.6+picosat (complete)2070707? 281.706 298.267
Concrete DC 2009-07-14 (complete)2070705? (TO) 1800.04 1819.52
Concrete 2009-07-14 (complete)2070704? (TO) 1800.06 1801.22
pcs-restart 0.3.2 (complete)2070703? (TO) 1800.12 1810.55

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
7 4 71 71 71 23 17 70 3 46 18 19 70 71 7 40 61 17 71 50 6 57 23 71 71 32 36 48 3 18 70 64 66 59 2 2 43 2 39 47 71 21 44 71 46 71 36 11 57 31
43 58 71 8 59 12 2 48 59 71 20 71 10 2 16 40 16 33 8 61 27 53 2 2 3 2 34 2 6 59 71 50 59 27 21 3 43 37 47 71 58 2 57 23 71 12 10 63 53 71