CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/bqwh-18-141_glb/
normalized-bqwh-18-141-17_glb.xml

Jump to solvers results

General information on the benchmark

Namecsp/bqwh-18-141_glb/
normalized-bqwh-18-141-17_glb.xml
MD5SUM70fc22474f51996c67704f768dac63a1
Bench CategoryAlldiff (alldiff)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.06399
Satisfiable
(Un)Satisfiability was proved
Number of variables141
Number of constraints36
Maximum constraint arity8
Maximum domain size6
Number of constraints which are defined in extension0
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)alldifferent(36)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2070435SAT 0.06399 0.069777
bpsolver 09 (complete)2070436SAT 0.069988 0.0819619
Choco2.1.1 2009-06-10 (complete)2070431SAT 0.711891 0.737789
Choco2.1.1b 2009-07-16 (complete)2115639SAT 0.745886 0.786431
Abscon 112v4 ESAC (complete)2095456SAT 1.08883 1.72657
Abscon 112v4 AC (complete)2095455SAT 1.11483 1.14749
Sugar v1.14.6+minisat (complete)2070433SAT 1.25381 1.68432
Sugar v1.14.6+picosat (complete)2070432SAT 1.3258 1.46032
SAT4J CSP 2.1.1 (complete)2070426SAT 1.3448 0.925715
Concrete 2009-07-14 (complete)2070429SAT 1.72074 1.76203
Concrete DC 2009-07-14 (complete)2070430SAT 5.67914 5.7702

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
12 16 1 6 2 10 9 14 17 0 8 5 16 7 14 3 6 17 13 2 16 0 5 15 15 16 0 6 3 13 12 17 8 9 13 4 15 5 6 11 3 5 4 13 2 14 6 11 5 0 14 3 6 16 12 7 11
17 16 14 4 12 6 3 2 15 14 17 7 8 0 13 15 7 17 12 8 16 11 6 0 12 9 16 5 13 15 10 1 7 8 9 11 14 13 9 10 5 7 15 11 12 13 3 6 10 11 7 4 5 1 4 12
11 10 0 2 6 0 15 3 10 13 17 14 12 16 10 1 13 5 14 17 11 9 1 17 12 14 3 15