CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/bqwh-18-141_glb/
normalized-bqwh-18-141-65_glb.xml

Jump to solvers results

General information on the benchmark

Namecsp/bqwh-18-141_glb/
normalized-bqwh-18-141-65_glb.xml
MD5SUMdfa558b060e7983d8da102eaa76c8c52
Bench CategoryAlldiff (alldiff)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.134979
Satisfiable
(Un)Satisfiability was proved
Number of variables141
Number of constraints36
Maximum constraint arity8
Maximum domain size6
Number of constraints which are defined in extension0
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)alldifferent(36)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2070403SAT 0.134979 0.141386
Mistral 1.545 (complete)2070402SAT 0.683895 0.684877
Choco2.1.1b 2009-07-16 (complete)2115636SAT 0.71589 0.736137
Choco2.1.1 2009-06-10 (complete)2070398SAT 0.734888 0.796081
Abscon 112v4 AC (complete)2095449SAT 0.835872 0.889034
SAT4J CSP 2.1.1 (complete)2070393SAT 1.18782 1.2541
Abscon 112v4 ESAC (complete)2095450SAT 1.22381 1.26397
Sugar v1.14.6+picosat (complete)2070399SAT 1.3368 1.39684
Sugar v1.14.6+minisat (complete)2070400SAT 1.41678 1.50707
Concrete 2009-07-14 (complete)2070396SAT 2.23266 2.28022
Concrete DC 2009-07-14 (complete)2070397SAT 4.69529 4.74485

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
11 1 12 15 8 0 9 4 2 7 9 11 14 17 13 6 0 5 13 3 8 10 12 17 13 14 10 3 7 0 12 16 17 10 14 12 2 1 11 9 9 13 4 15 6 5 17 1 13 8 1 16 7 11 10 0
5 15 10 1 12 8 17 6 11 4 7 6 9 15 5 10 1 7 15 17 6 12 16 15 2 16 1 10 12 13 11 8 5 6 3 4 13 7 3 17 0 1 9 7 2 10 5 14 2 6 15 16 12 1 17 15 13
6 8 12 7 3 12 10 5 0 4 17 14 7 13 1 10 11 4 14 7 0 2 3 5 15 11 7 0