CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/wordsVg/
normalized-crossword-m1c-words-vg4-4_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/wordsVg/
normalized-crossword-m1c-words-vg4-4_ext.xml
MD5SUMe206cfa7812e1b0f3b51a5e2c1d8afd0
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.015997
Satisfiable
(Un)Satisfiability was proved
Number of variables16
Number of constraints8
Maximum constraint arity4
Maximum domain size26
Number of constraints which are defined in extension8
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2070006SAT 0.015997 0.0182359
pcs 0.3.2 (complete)2069998SAT 0.025995 0.031996
pcs-restart 0.3.2 (complete)2069999SAT 0.025995 0.0325261
bpsolver 09 (complete)2070007SAT 0.154975 0.161759
Conquer 2009-07-10 (complete)2070005SAT 0.635902 0.817294
Choco2.1.1b 2009-07-16 (complete)2115600SAT 0.668897 0.675973
Abscon 112v4 ESAC (complete)2095378SAT 0.691894 0.74372
Abscon 112v4 AC (complete)2095377SAT 0.698893 0.730676
Choco2.1.1 2009-06-10 (complete)2070002SAT 0.746885 0.790682
Concrete 2009-07-14 (complete)2070000SAT 1.00485 1.02952
Sugar v1.14.6+minisat (complete)2070004SAT 1.69574 1.76471
Sugar v1.14.6+picosat (complete)2070003SAT 2.25866 2.98408
Concrete DC 2009-07-14 (complete)2070001SAT 3.89641 3.95822
SAT4J CSP 2.1.1 (complete)2069997SAT 30.4264 29.5106

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
4 17 0 18 11 14 20 19 1 0 17 4 0 3 0 12