CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/tdsp/
normalized-C6-2-120.xml

Jump to solvers results

General information on the benchmark

Namecsp/tdsp/
normalized-C6-2-120.xml
MD5SUMd75a5b973487bf2f1b95455d185d9f13
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables293
Number of constraints4850
Maximum constraint arity6
Maximum domain size121
Number of constraints which are defined in extension0
Number of constraints which are defined in intension4850
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
SAT4J CSP 2.1.1 (complete)2068963? 1131.24 1134.02
Sugar v1.14.6+minisat (complete)2068970? (MO) 668.203 669.534
Sugar v1.14.6+picosat (complete)2068969? (TO) 1800.02 1817.91
Concrete 2009-07-14 (complete)2068966? (TO) 1800.05 1809.43
Mistral 1.545 (complete)2068972? (TO) 1800.05 1809.52
Concrete DC 2009-07-14 (complete)2068967? (TO) 1800.08 1800.73
Abscon 112v4 AC (complete)2095189? (TO) 1800.09 1815.35
bpsolver 09 (complete)2068973? (TO) 1800.09 1801.62
Choco2.1.1b 2009-07-16 (complete)2115506? (TO) 1800.13 1815.39
pcs-restart 0.3.2 (complete)2068965? (TO) 1800.14 1805.2
Abscon 112v4 ESAC (complete)2095190? (TO) 1800.15 1801.86
Choco2.1.1 2009-06-10 (complete)2068968? (TO) 1800.15 1807.61
pcs 0.3.2 (complete)2068964? (TO) 1800.17 1815.5

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: