CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/tdsp/
normalized-C7-3-240.xml

Jump to solvers results

General information on the benchmark

Namecsp/tdsp/
normalized-C7-3-240.xml
MD5SUMf9fb4b9e93d84a370d6e24bfb8078515
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables590
Number of constraints19502
Maximum constraint arity6
Maximum domain size241
Number of constraints which are defined in extension0
Number of constraints which are defined in intension19502
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Sugar v1.14.6+picosat (complete)2068958? 278.002 289.388
Choco2.1.1b 2009-07-16 (complete)2115505? (problem) 92.08 92.5836
Choco2.1.1 2009-06-10 (complete)2068957? (problem) 105.552 106.632
Sugar v1.14.6+minisat (complete)2068959? (TO) 145.158 2002.04
Concrete 2009-07-14 (complete)2068955? (TO) 1800 1801.83
Concrete DC 2009-07-14 (complete)2068956? (TO) 1800.08 1804.32
Mistral 1.545 (complete)2068961? (TO) 1800.1 1809.55
bpsolver 09 (complete)2068962? (TO) 1800.14 1812.34
pcs-restart 0.3.2 (complete)2068954? (TO) 1800.14 1809.06
SAT4J CSP 2.1.1 (complete)2068952? (TO) 1800.14 1808.72
pcs 0.3.2 (complete)2068953? (TO) 1800.17 1802.86
Abscon 112v4 ESAC (complete)2095188? (TO) 1800.2 1810.03
Abscon 112v4 AC (complete)2095187? (TO) 1800.26 1812.76

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: