CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/tdsp/
normalized-C7-2-241.xml

Jump to solvers results

General information on the benchmark

Namecsp/tdsp/
normalized-C7-2-241.xml
MD5SUM8d8cf1b474fe7a5bceeecee77718d1b9
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables593
Number of constraints19700
Maximum constraint arity6
Maximum domain size242
Number of constraints which are defined in extension0
Number of constraints which are defined in intension19700
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Sugar v1.14.6+picosat (complete)2068914? 256.722 860.987
Sugar v1.14.6+minisat (complete)2068915? 257.302 269.337
SAT4J CSP 2.1.1 (complete)2068908? 1364.7 1369.79
Choco2.1.1b 2009-07-16 (complete)2115501? (problem) 96.3154 97.2798
Choco2.1.1 2009-06-10 (complete)2068913? (problem) 98.768 99.8234
Concrete 2009-07-14 (complete)2068911? (TO) 1800.01 1819.12
Concrete DC 2009-07-14 (complete)2068912? (TO) 1800.01 1804.82
bpsolver 09 (complete)2068918? (TO) 1800.07 1804.04
pcs 0.3.2 (complete)2068909? (TO) 1800.1 1812.96
pcs-restart 0.3.2 (complete)2068910? (TO) 1800.12 1808.96
Mistral 1.545 (complete)2068917? (TO) 1800.14 1801.25
Abscon 112v4 ESAC (complete)2095180? (TO) 1800.23 1816.25
Abscon 112v4 AC (complete)2095179? (TO) 1800.25 1810.37

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: