CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/pseudo/chnl/
normalized-chnl-15-25.xml

Jump to solvers results

General information on the benchmark

Namecsp/pseudo/chnl/
normalized-chnl-15-25.xml
MD5SUMf70cee8aea8e6dba5684d6a04a95edf3
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables750
Number of constraints80
Maximum constraint arity25
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
SAT4J CSP 2.1.1 (complete)2066334? 295.147 296.154
pcs-restart 0.3.2 (complete)2066336? (MO) 193.689 195.557
pcs 0.3.2 (complete)2066335? (MO) 196.889 196.951
Sugar v1.14.6+minisat (complete)2066341? (TO) 1800.03 1818.42
Mistral 1.545 (complete)2066343? (TO) 1800.05 1801.21
Concrete 2009-07-14 (complete)2066337? (TO) 1800.08 1813.02
bpsolver 09 (complete)2066344? (TO) 1800.08 1801.41
Sugar v1.14.6+picosat (complete)2066340? (TO) 1800.09 1803.52
Abscon 112v4 ESAC (complete)2094712? (TO) 1800.1 1801.54
Concrete DC 2009-07-14 (complete)2066338? (TO) 1800.1 1809.43
Choco2.1.1 2009-06-10 (complete)2066339? (TO) 1800.12 1809.77
Choco2.1.1b 2009-07-16 (complete)2115267? (TO) 1800.12 1804.76
Abscon 112v4 AC (complete)2094711? (TO) 1800.15 1816.68

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: