CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/pseudo/chnl/
normalized-chnl-10-20.xml

Jump to solvers results

General information on the benchmark

Namecsp/pseudo/chnl/
normalized-chnl-10-20.xml
MD5SUMc229cff344c03cb393bb28ed8fbc7d87
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark12.2641
Satisfiable
(Un)Satisfiability was proved
Number of variables400
Number of constraints60
Maximum constraint arity20
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension60
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Sugar v1.14.6+minisat (complete)2066319UNSAT 12.2641 12.4066
Sugar v1.14.6+picosat (complete)2066318UNSAT 25.6961 26.015
Abscon 112v4 ESAC (complete)2094708UNSAT 52.452 52.9903
Abscon 112v4 AC (complete)2094707UNSAT 245.7 245.852
Mistral 1.545 (complete)2066321UNSAT 331.073 333.605
SAT4J CSP 2.1.1 (complete)2066312? 1239.66 1249.13
pcs 0.3.2 (complete)2066313? (MO) 161.087 162.054
pcs-restart 0.3.2 (complete)2066314? (MO) 170.418 172.051
Concrete DC 2009-07-14 (complete)2066316? (TO) 1800.01 1807.32
Concrete 2009-07-14 (complete)2066315? (TO) 1800.08 1815.22
bpsolver 09 (complete)2066322? (TO) 1800.08 1807.91
Choco2.1.1 2009-06-10 (complete)2066317? (TO) 1800.11 1809.06
Choco2.1.1b 2009-07-16 (complete)2115265? (TO) 1800.16 1801.28

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: