CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/pseudo/chnl/
normalized-chnl-20-30.xml

Jump to solvers results

General information on the benchmark

Namecsp/pseudo/chnl/
normalized-chnl-20-30.xml
MD5SUMde1a4b88e074f5e2a8f7cfa8a5e48f0f
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables1200
Number of constraints100
Maximum constraint arity30
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension100
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
SAT4J CSP 2.1.1 (complete)2066257? 838.151 842.668
pcs 0.3.2 (complete)2066258? (MO) 194.785 195.347
pcs-restart 0.3.2 (complete)2066259? (MO) 199.686 201.445
Sugar v1.14.6+picosat (complete)2066263? (TO) 1800.03 1816.52
bpsolver 09 (complete)2066267? (TO) 1800.03 1814.11
Concrete 2009-07-14 (complete)2066260? (TO) 1800.06 1806.02
Sugar v1.14.6+minisat (complete)2066264? (TO) 1800.07 1801.22
Choco2.1.1 2009-06-10 (complete)2066262? (TO) 1800.07 1815.44
Concrete DC 2009-07-14 (complete)2066261? (TO) 1800.08 1809.22
Mistral 1.545 (complete)2066266? (TO) 1800.09 1806.11
Abscon 112v4 AC (complete)2094697? (TO) 1800.09 1817.26
Abscon 112v4 ESAC (complete)2094698? (TO) 1800.12 1816.26
Choco2.1.1b 2009-07-16 (complete)2115260? (TO) 1800.15 1817.06

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: