CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/ramsey3/
normalized-ramsey-10-3.xml

Jump to solvers results

General information on the benchmark

Namecsp/ramsey3/
normalized-ramsey-10-3.xml
MD5SUMa5131e83765956a67790d7f7ec0960b8
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.009997
Satisfiable
(Un)Satisfiability was proved
Number of variables45
Number of constraints120
Maximum constraint arity3
Maximum domain size3
Number of constraints which are defined in extension0
Number of constraints which are defined in intension120
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2065881SAT 0.009997 0.018706
pcs 0.3.2 (complete)2065873SAT 0.053991 0.0638829
bpsolver 09 (complete)2065882SAT 0.05999 0.0656591
pcs-restart 0.3.2 (complete)2065874SAT 0.108982 0.113726
Choco2.1.1 2009-06-10 (complete)2065877SAT 0.745886 0.795771
Choco2.1.1b 2009-07-16 (complete)2115225SAT 0.763883 0.812169
Sugar v1.14.6+picosat (complete)2065878SAT 0.879865 1.02254
Abscon 112v4 ESAC (complete)2094628SAT 0.896863 0.944996
Abscon 112v4 AC (complete)2094627SAT 0.897862 0.945325
Sugar v1.14.6+minisat (complete)2065879SAT 0.986849 1.11788
Concrete 2009-07-14 (complete)2065875SAT 1.3048 1.37423
SAT4J CSP 2.1.1 (complete)2065872SAT 1.3158 1.36293
Concrete DC 2009-07-14 (complete)2065876SAT 1.41278 1.4654

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 1 2 1 0 0 1 2 0 2 0 1 2 1 0 0 2 2 2 0 0 0 1 0 0 2 0 2 1 0 0 2 0 2 2 2 1 0 1 2 0 1 2 2 0