CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-3-28-28/
normalized-rand-3-28-28-93-632-41_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-3-28-28/
normalized-rand-3-28-28-93-632-41_ext.xml
MD5SUM977aeeb2aac26fe232d05998ce5b841c
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark1089.31
Satisfiable
(Un)Satisfiability was proved
Number of variables28
Number of constraints93
Maximum constraint arity3
Maximum domain size28
Number of constraints which are defined in extension93
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Choco2.1.1b 2009-07-16 (complete)2115129SAT 1089.31 1095.11
Sugar v1.14.6+minisat (complete)2064823? (MO) 7.5 7.6765
Sugar v1.14.6+picosat (complete)2064822? (MO) 7.93 8.16622
Concrete 2009-07-14 (complete)2064819? (TO) 1800.01 1811.22
pcs-restart 0.3.2 (complete)2064818? (TO) 1800.05 1812.92
Concrete DC 2009-07-14 (complete)2064820? (TO) 1800.06 1815.52
Conquer 2009-07-10 (complete)2064824? (TO) 1800.06 1809.62
Abscon 112v4 ESAC (complete)2094436? (TO) 1800.08 1809.25
Mistral 1.545 (complete)2064825? (TO) 1800.08 1813.11
pcs 0.3.2 (complete)2064817? (TO) 1800.08 1813.52
Abscon 112v4 AC (complete)2094435? (TO) 1800.09 1807.45
Choco2.1.1 2009-06-10 (complete)2064821? (TO) 1800.11 1817.19
bpsolver 09 (complete)2064826? (TO) 1800.15 1811.95
SAT4J CSP 2.1.1 (complete)2064816? (TO) 1800.59 1811.13

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
6 7 17 22 5 23 5 11 8 25 6 26 2 18 13 12 3 27 2 25 12 16 6 8 25 23 0 25