CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/compet08/
normalized-patat-08-comp-9.xml

Jump to solvers results

General information on the benchmark

Namecsp/compet08/
normalized-patat-08-comp-9.xml
MD5SUM4d24835c800de52d756640e8552cd3e9
Bench CategoryAlldiff (alldiff)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables800
Number of constraints32974
Maximum constraint arity24
Maximum domain size33
Number of constraints which are defined in extension0
Number of constraints which are defined in intension32474
Global constraints used (with number of constraints)alldifferent(500)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Sugar v1.14.6+minisat (complete)2063888? 552.91 553.137
Sugar v1.14.6+picosat (complete)2063887? 563.859 566.856
bpsolver 09 (complete)2063891? (TO) 1800.02 1812.32
Mistral 1.545 (complete)2063890? (TO) 1800.05 1807.62
Concrete DC 2009-07-14 (complete)2063885? (TO) 1800.07 1810.22
Concrete 2009-07-14 (complete)2063884? (TO) 1800.09 1805.32
Choco2.1.1 2009-06-10 (complete)2063886? (TO) 1800.12 1812.59
Choco2.1.1b 2009-07-16 (complete)2115044? (TO) 1800.12 1807.81
Abscon 112v4 ESAC (complete)2094266? (TO) 1800.15 1802.39
Abscon 112v4 AC (complete)2094265? (TO) 1800.23 1811.91
SAT4J CSP 2.1.1 (complete)2063881? (TO) 1800.35 1800.96

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: