CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-9-28-4-2/
normalized-radar-9-28-4-2-21.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-21.xml
MD5SUM7a0a03ac533bc7ea71ce361c16d54d22
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.063989
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity21
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063813UNSAT 0.063989 0.0660639
pcs-restart 0.3.2 (complete)2063806UNSAT 0.122981 0.134699
pcs 0.3.2 (complete)2063805UNSAT 0.127979 0.134812
bpsolver 09 (complete)2063814UNSAT 0.136978 0.168365
Choco2.1.1b 2009-07-16 (complete)2115037UNSAT 1.38579 1.43351
Choco2.1.1 2009-06-10 (complete)2063809UNSAT 1.55876 1.59901
Sugar v1.14.6+minisat (complete)2063811UNSAT 1.56876 1.69841
Sugar v1.14.6+picosat (complete)2063810UNSAT 1.9357 1.999
SAT4J CSP 2.1.1 (complete)2063804? 282.489 283.162
Concrete DC 2009-07-14 (complete)2063808? (TO) 1800.02 1801.32
Concrete 2009-07-14 (complete)2063807? (TO) 1800.04 1810.02
Abscon 112v4 AC (complete)2094251? (TO) 1800.07 1804.44
Abscon 112v4 ESAC (complete)2094252? (TO) 1800.08 1816.43

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: