CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-9-28-4-2/
normalized-radar-9-28-4-2-22.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-22.xml
MD5SUM0e040060f5dc0c527615ab5f594564d4
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.061989
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity23
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063802UNSAT 0.061989 0.067338
pcs-restart 0.3.2 (complete)2063795UNSAT 0.114982 0.12142
pcs 0.3.2 (complete)2063794UNSAT 0.116982 0.122931
bpsolver 09 (complete)2063803UNSAT 0.12298 0.128209
Choco2.1.1 2009-06-10 (complete)2063798UNSAT 1.3148 1.50296
Choco2.1.1b 2009-07-16 (complete)2115036UNSAT 1.38579 1.42078
Sugar v1.14.6+minisat (complete)2063800UNSAT 1.89771 2.23978
Sugar v1.14.6+picosat (complete)2063799UNSAT 2.17267 2.32124
Abscon 112v4 AC (complete)2094249UNSAT 2.50962 2.55999
Abscon 112v4 ESAC (complete)2094250UNSAT 2.6326 2.67337
Concrete DC 2009-07-14 (complete)2063797UNSAT 64.8421 65.4808
Concrete 2009-07-14 (complete)2063796UNSAT 67.1588 67.8124
SAT4J CSP 2.1.1 (complete)2063793? (TO) 1802.22 1807.14

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: