CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-9-28-4-2/
normalized-radar-9-28-4-2-29.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-29.xml
MD5SUM780ac7c3256afa3bb183f60e445bc901
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.066989
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity23
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063769UNSAT 0.066989 0.0734669
pcs-restart 0.3.2 (complete)2063762UNSAT 0.12998 0.136803
pcs 0.3.2 (complete)2063761UNSAT 0.130979 0.137301
bpsolver 09 (complete)2063770UNSAT 0.139978 0.146404
Choco2.1.1b 2009-07-16 (complete)2115033UNSAT 1.40479 1.43386
Choco2.1.1 2009-06-10 (complete)2063765UNSAT 1.46778 1.4969
Sugar v1.14.6+minisat (complete)2063767UNSAT 1.84172 2.0024
Sugar v1.14.6+picosat (complete)2063766UNSAT 2.24066 2.3573
SAT4J CSP 2.1.1 (complete)2063760? 220.934 221.246
Concrete 2009-07-14 (complete)2063763? (TO) 1800.03 1808.62
Concrete DC 2009-07-14 (complete)2063764? (TO) 1800.04 1809.22
Abscon 112v4 ESAC (complete)2094244? (TO) 1800.09 1807.63
Abscon 112v4 AC (complete)2094243? (TO) 1800.1 1816.67

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: