CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-9-28-4-2/
normalized-radar-9-28-4-2-8.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-8.xml
MD5SUMcd1b9d0af9a2e309aad42650a4d4ed0e
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.05999
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity22
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063758UNSAT 0.05999 0.0696001
pcs 0.3.2 (complete)2063750UNSAT 0.112982 0.118721
pcs-restart 0.3.2 (complete)2063751UNSAT 0.114982 0.12225
bpsolver 09 (complete)2063759UNSAT 0.118981 0.119174
Choco2.1.1b 2009-07-16 (complete)2115032UNSAT 1.3208 1.37322
Choco2.1.1 2009-06-10 (complete)2063754UNSAT 1.42378 1.47903
Sugar v1.14.6+minisat (complete)2063756UNSAT 1.60176 1.77941
Sugar v1.14.6+picosat (complete)2063755UNSAT 2.08468 2.24199
Abscon 112v4 AC (complete)2094241UNSAT 2.6416 2.71766
Abscon 112v4 ESAC (complete)2094242UNSAT 2.67859 2.71378
Concrete DC 2009-07-14 (complete)2063753UNSAT 88.6045 89.0693
Concrete 2009-07-14 (complete)2063752UNSAT 95.5685 96.0664
SAT4J CSP 2.1.1 (complete)2063749? 280.513 281.245

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: