General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-20.xml
MD5SUM34d91dbe04a221744d0cdc2437d0b749
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.064989
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity24
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063725UNSAT 0.064989 0.0652921
pcs-restart 0.3.2 (complete)2063718UNSAT 0.122981 0.129993
pcs 0.3.2 (complete)2063717UNSAT 0.12598 0.134673
bpsolver 09 (complete)2063726UNSAT 0.134979 0.14248
Choco2.1.1b 2009-07-16 (complete)2115029UNSAT 1.38279 1.42537
Choco2.1.1 2009-06-10 (complete)2063721UNSAT 1.42978 1.47458
Sugar v1.14.6+minisat (complete)2063723UNSAT 1.66075 1.79993
Sugar v1.14.6+picosat (complete)2063722UNSAT 2.18267 2.3748
Abscon 112v4 ESAC (complete)2094236UNSAT 83.1634 83.985
Abscon 112v4 AC (complete)2094235UNSAT 83.1784 84.0229
Concrete 2009-07-14 (complete)2063719UNSAT 1106.52 1106.66
Concrete DC 2009-07-14 (complete)2063720UNSAT 1121.66 1125.13
SAT4J CSP 2.1.1 (complete)2063716? 283.513 284.661

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: