CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-9-28-4-2/
normalized-radar-9-28-4-2-37.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-37.xml
MD5SUMa081997a6c8df00d150f0d73a7c85627
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.061989
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity23
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063703UNSAT 0.061989 0.0637761
pcs 0.3.2 (complete)2063695UNSAT 0.115981 0.123265
pcs-restart 0.3.2 (complete)2063696UNSAT 0.119981 0.125924
bpsolver 09 (complete)2063704UNSAT 0.136978 0.146822
Choco2.1.1b 2009-07-16 (complete)2115027UNSAT 1.26781 1.31597
Choco2.1.1 2009-06-10 (complete)2063699UNSAT 1.37779 1.42439
Sugar v1.14.6+minisat (complete)2063701UNSAT 1.62675 1.74664
Sugar v1.14.6+picosat (complete)2063700UNSAT 2.02669 2.17846
Concrete 2009-07-14 (complete)2063697UNSAT 59.148 59.4893
Concrete DC 2009-07-14 (complete)2063698UNSAT 80.1298 80.912
Abscon 112v4 AC (complete)2094231UNSAT 353.793 354.002
Abscon 112v4 ESAC (complete)2094232UNSAT 359.916 363.347
SAT4J CSP 2.1.1 (complete)2063694? 280.572 280.79

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: