CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-9-28-4-2/
normalized-radar-9-28-4-2-43.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-43.xml
MD5SUM80f9deb82500e1b4197867c0c639f6ff
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.05999
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity22
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063659UNSAT 0.05999 0.064173
pcs 0.3.2 (complete)2063651UNSAT 0.113982 0.123219
pcs-restart 0.3.2 (complete)2063652UNSAT 0.113982 0.119808
bpsolver 09 (complete)2063660UNSAT 0.11998 0.126371
Choco2.1.1 2009-06-10 (complete)2063655UNSAT 1.38179 1.43427
Choco2.1.1b 2009-07-16 (complete)2115023UNSAT 1.39779 1.47448
Sugar v1.14.6+minisat (complete)2063657UNSAT 1.78773 2.18349
Sugar v1.14.6+picosat (complete)2063656UNSAT 1.9317 2.03132
Abscon 112v4 ESAC (complete)2094224UNSAT 2.27965 2.36095
Abscon 112v4 AC (complete)2094223UNSAT 2.29765 2.38398
Concrete DC 2009-07-14 (complete)2063654UNSAT 60.6228 60.9899
Concrete 2009-07-14 (complete)2063653UNSAT 64.0673 64.24
SAT4J CSP 2.1.1 (complete)2063650? 305.404 305.017

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: