CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-9-28-4-2/
normalized-radar-9-28-4-2-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-7.xml
MD5SUM5175a62a7f0389e4017b8b12a04e7310
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.05899
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity22
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063637UNSAT 0.05899 0.0635651
pcs-restart 0.3.2 (complete)2063630UNSAT 0.106983 0.120249
pcs 0.3.2 (complete)2063629UNSAT 0.106983 0.114569
bpsolver 09 (complete)2063638UNSAT 0.130979 0.135845
Choco2.1.1b 2009-07-16 (complete)2115021UNSAT 1.39879 1.44052
Choco2.1.1 2009-06-10 (complete)2063633UNSAT 1.49777 1.54303
Sugar v1.14.6+minisat (complete)2063635UNSAT 1.69874 1.87486
Sugar v1.14.6+picosat (complete)2063634UNSAT 1.9437 2.09311
Abscon 112v4 AC (complete)2094219UNSAT 1157.99 1168.72
Abscon 112v4 ESAC (complete)2094220UNSAT 1176.52 1187.69
SAT4J CSP 2.1.1 (complete)2063628? 1664.25 1669.37
Concrete DC 2009-07-14 (complete)2063632? (TO) 1800.01 1817.23
Concrete 2009-07-14 (complete)2063631? (TO) 1800.04 1801.83

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: