CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-9-28-4-2/
normalized-radar-9-28-4-2-25.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-9-28-4-2/
normalized-radar-9-28-4-2-25.xml
MD5SUM1113c5e165e15fbc02acacf7c62f8d1a
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.065989
Satisfiable
(Un)Satisfiability was proved
Number of variables168
Number of constraints81
Maximum constraint arity20
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension81
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063626UNSAT 0.065989 0.124172
pcs-restart 0.3.2 (complete)2063619UNSAT 0.109983 0.122683
pcs 0.3.2 (complete)2063618UNSAT 0.111982 0.117321
bpsolver 09 (complete)2063627UNSAT 0.12698 0.135584
Choco2.1.1b 2009-07-16 (complete)2115020UNSAT 1.21481 1.25711
Choco2.1.1 2009-06-10 (complete)2063622UNSAT 1.3268 1.45241
Sugar v1.14.6+minisat (complete)2063624UNSAT 1.68774 1.78971
Sugar v1.14.6+picosat (complete)2063623UNSAT 2.03269 2.30431
SAT4J CSP 2.1.1 (complete)2063617? 1100.51 1105.08
Concrete 2009-07-14 (complete)2063620? (TO) 1800.06 1809.02
Concrete DC 2009-07-14 (complete)2063621? (TO) 1800.06 1808.62
Abscon 112v4 ESAC (complete)2094218? (TO) 1800.1 1811.07
Abscon 112v4 AC (complete)2094217? (TO) 1800.13 1801.15

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: