CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-25/
normalized-primes-25-40-2-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-25/
normalized-primes-25-40-2-7.xml
MD5SUM7aef82243bc2aebd1c139344929a6be1
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark13.464
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints40
Maximum constraint arity9
Maximum domain size96
Number of constraints which are defined in extension0
Number of constraints which are defined in intension40
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Choco2.1.1b 2009-07-16 (complete)2115016SAT 13.464 13.6233
bpsolver 09 (complete)2063583SAT 28.3097 28.4462
Choco2.1.1 2009-06-10 (complete)2063578SAT 169.553 171.176
Mistral 1.545 (complete)2063582SAT 693.689 696.573
SAT4J CSP 2.1.1 (complete)2063573? 145.014 144.071
Sugar v1.14.6+picosat (complete)2063579? 244.9 255.009
Sugar v1.14.6+minisat (complete)2063580? 248.936 257.874
Concrete DC 2009-07-14 (complete)2063577? (TO) 1800.03 1810.32
Concrete 2009-07-14 (complete)2063576? (TO) 1800.03 1801.83
Abscon 112v4 ESAC (complete)2094210? (TO) 1800.07 1800.84
pcs 0.3.2 (complete)2063574? (TO) 1800.08 1814.54
pcs-restart 0.3.2 (complete)2063575? (TO) 1800.09 1816.15
Abscon 112v4 AC (complete)2094209? (TO) 1800.17 1814.98

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
19 34 39 21 80 31 30 71 21 87 23 19 4 42 88 43 4 5 88 54 40 10 37 14 97 51 9 13 15 75 6 18 81 37 46 17 52 5 79 59 7 97 88 67 8 14 56 27 48
73 33 61 8 57 15 80 3 67 51 90 51 59 47 13 37 21 23 46 43 18 41 76 27 3 67 76 35 14 61 41 77 52 12 28 23 57 41 58 35 90 13 15 3 18 53 14 34
5 71 8