CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-25/
normalized-primes-25-40-2-3.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-25/
normalized-primes-25-40-2-3.xml
MD5SUMce9a6eaf4eb9334fd017d19e3068bbd4
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.019996
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints40
Maximum constraint arity5
Maximum domain size96
Number of constraints which are defined in extension0
Number of constraints which are defined in intension40
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063571SAT 0.019996 0.0287479
bpsolver 09 (complete)2063572SAT 0.879865 0.888062
Choco2.1.1b 2009-07-16 (complete)2115015SAT 1.15882 1.19958
Choco2.1.1 2009-06-10 (complete)2063567SAT 1.3068 1.32888
Abscon 112v4 AC (complete)2094207SAT 11.9232 12.0891
Abscon 112v4 ESAC (complete)2094208SAT 56.4224 56.9685
Sugar v1.14.6+minisat (complete)2063569SAT 56.9533 57.7272
Sugar v1.14.6+picosat (complete)2063568SAT 88.6375 89.7172
SAT4J CSP 2.1.1 (complete)2063562? 818.267 820.144
Concrete DC 2009-07-14 (complete)2063566? (TO) 1800.02 1809.03
pcs 0.3.2 (complete)2063563? (TO) 1800.04 1801.13
Concrete 2009-07-14 (complete)2063565? (TO) 1800.06 1805.62
pcs-restart 0.3.2 (complete)2063564? (TO) 1800.07 1808.03

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
13 56 97 46 53 31 82 97 76 81 84 3 76 97 55 19 2 3 83 53 37 62 46 97 19 19 81 95 24 90 97 11 88 16 71 31 49 97 42 68 2 97 65 88 26 97 62 91
73 52 2 8 59 77 29 74 33 65 32 17 13 2 2 5 25 54 44 97 63 2 97 2 10 73 52 61 2 41 97 21 2 87 2 97 76 2 78 76 41 97 97 2 47 50 89 7 51 3 79
42