CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-25/
normalized-primes-25-80-3-5.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-25/
normalized-primes-25-80-3-5.xml
MD5SUMc3b3a68ace92b9a3e2f2e99b84357c33
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark1.3348
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity8
Maximum domain size96
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063527SAT 1.3348 1.42992
Choco2.1.1b 2009-07-16 (complete)2115011SAT 5.77612 5.8375
Choco2.1.1 2009-06-10 (complete)2063523SAT 20.4879 20.8146
bpsolver 09 (complete)2063528SAT 39.281 39.6518
SAT4J CSP 2.1.1 (complete)2063518? 186.494 184.918
Sugar v1.14.6+picosat (complete)2063524? 287.137 299.436
Sugar v1.14.6+minisat (complete)2063525? 563.891 589.491
Concrete 2009-07-14 (complete)2063521? (TO) 1800.08 1804.02
Abscon 112v4 AC (complete)2094199? (TO) 1800.08 1816.55
Concrete DC 2009-07-14 (complete)2063522? (TO) 1800.09 1801.82
Abscon 112v4 ESAC (complete)2094200? (TO) 1800.15 1807.53
pcs 0.3.2 (complete)2063519? (TO) 1800.17 1817
pcs-restart 0.3.2 (complete)2063520? (TO) 1800.2 1808.21

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
23 37 5 53 67 31 37 61 97 79 41 5 53 29 43 3 53 3 83 37 37 67 61 11 19 13 41 89 61 31 11 5 83 23 71 61 67 17 37 61 11 89 79 71 29 41 89 97
53 73 43 3 59 13 17 89 41 73 79 17 13 2 29 5 37 13 79 11 43 19 97 73 19 73 47 61 29 47 67 2 41 23 3 7 43 29 7 3 11 97 19 31 3 67 47 41 3 37
71 47