CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-25/
normalized-primes-25-20-3-5.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-25/
normalized-primes-25-20-3-5.xml
MD5SUMc1092c8d9e64034095c8be22fde7467a
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.015997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity8
Maximum domain size96
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063505SAT 0.015997 0.022626
bpsolver 09 (complete)2063506SAT 0.044992 0.0462039
Choco2.1.1b 2009-07-16 (complete)2115009SAT 0.98085 0.994637
Choco2.1.1 2009-06-10 (complete)2063501SAT 1.10183 1.12367
pcs-restart 0.3.2 (complete)2063498SAT 581.354 583.987
Abscon 112v4 AC (complete)2094195SAT 1296.58 1299.75
Abscon 112v4 ESAC (complete)2094196SAT 1301.96 1302.58
SAT4J CSP 2.1.1 (complete)2063496? 141.469 139.612
Sugar v1.14.6+minisat (complete)2063503? 353.472 369.418
Sugar v1.14.6+picosat (complete)2063502? 385.378 406.902
pcs 0.3.2 (complete)2063497? (TO) 1800.08 1815.82
Concrete 2009-07-14 (complete)2063499? (TO) 1800.09 1800.63
Concrete DC 2009-07-14 (complete)2063500? (TO) 1800.09 1810.42

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
13 97 83 17 2 2 97 97 2 72 94 2 2 97 2 2 2 31 81 81 2 69 34 97 97 51 70 97 95 89 97 96 88 97 2 24 2 97 2 97 51 2 2 97 2 97 86 97 17 97 97 95
97 97 26 51 38 5 97 97 75 2 2 90 97 4 97 31 97 97 97 88 95 97 97 40 2 97 92 90 97 7 63 97 9 2 77 97 48 48 2 97 97 97 97 4 53 69 2 71