CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-25/
normalized-primes-25-40-2-1.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-25/
normalized-primes-25-40-2-1.xml
MD5SUM84c0ab3a3a1e0883579d017d665e5c8f
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.012997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints40
Maximum constraint arity3
Maximum domain size96
Number of constraints which are defined in extension0
Number of constraints which are defined in intension40
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2063494SAT 0.012997 0.0201111
bpsolver 09 (complete)2063495SAT 0.040993 0.050221
pcs-restart 0.3.2 (complete)2063487SAT 0.12198 0.124538
pcs 0.3.2 (complete)2063486SAT 0.134979 0.143593
Choco2.1.1 2009-06-10 (complete)2063490SAT 0.77788 0.839966
Sugar v1.14.6+minisat (complete)2063492SAT 0.794879 0.854407
Choco2.1.1b 2009-07-16 (complete)2115008SAT 0.812875 0.842091
Sugar v1.14.6+picosat (complete)2063491SAT 0.887864 0.983771
Concrete 2009-07-14 (complete)2063488SAT 2.47662 2.47878
Abscon 112v4 ESAC (complete)2094194SAT 2.55461 2.57905
Abscon 112v4 AC (complete)2094193SAT 2.87256 2.91846
Concrete DC 2009-07-14 (complete)2063489SAT 69.1795 69.9005
SAT4J CSP 2.1.1 (complete)2063485SAT 173.802 173.007

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
23 37 5 96 67 31 37 61 97 79 2 97 53 29 97 2 53 3 83 37 2 67 97 97 19 13 97 89 61 31 11 5 83 23 2 2 67 17 37 97 11 89 79 71 85 97 89 95 2 73
43 3 2 13 2 42 41 73 79 17 13 97 97 97 37 97 97 97 43 60 97 73 2 73 47 2 97 2 2 2 97 23 16 2 43 29 97 97 11 2 19 2 2 97 47 2 3 36 71 47