CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-3-24-24/
normalized-rand-3-24-24-76-632-30_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-3-24-24/
normalized-rand-3-24-24-76-632-30_ext.xml
MD5SUMbb19e86a0a2939b467d1ac63852856fd
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark688.56
Satisfiable
(Un)Satisfiability was proved
Number of variables24
Number of constraints72
Maximum constraint arity3
Maximum domain size24
Number of constraints which are defined in extension72
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Choco2.1.1b 2009-07-16 (complete)2114984SAT 688.56 691.956
Mistral 1.545 (complete)2063230SAT 1176.2 1182.15
Conquer 2009-07-10 (complete)2063229? (TO) 1800.03 1806.82
pcs-restart 0.3.2 (complete)2063223? (TO) 1800.04 1802.52
Choco2.1.1 2009-06-10 (complete)2063226? (TO) 1800.04 1806.94
Sugar v1.14.6+minisat (complete)2063228? (TO) 1800.08 1812.92
Concrete 2009-07-14 (complete)2063224? (TO) 1800.09 1805.22
Concrete DC 2009-07-14 (complete)2063225? (TO) 1800.1 1805.02
Abscon 112v4 AC (complete)2094145? (TO) 1800.1 1801.85
bpsolver 09 (complete)2063231? (TO) 1800.11 1800.93
Abscon 112v4 ESAC (complete)2094146? (TO) 1800.11 1807.55
pcs 0.3.2 (complete)2063222? (TO) 1800.12 1809.22
Sugar v1.14.6+picosat (complete)2063227? (TO) 1800.13 1807.12
SAT4J CSP 2.1.1 (complete)2063221? (TO) 1801.03 1807.65

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
16 1 16 7 1 22 8 7 21 16 20 14 13 22 17 17 0 12 5 18 1 18 14 15