CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/jnhSat/
normalized-jnh212_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/jnhSat/
normalized-jnh212_ext.xml
MD5SUM283860118093024ae0c8b91c2294794a
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.032994
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints800
Maximum constraint arity11
Maximum domain size2
Number of constraints which are defined in extension800
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2062922SAT 0.032994 0.0348239
pcs 0.3.2 (complete)2062914SAT 0.040993 0.0485121
pcs-restart 0.3.2 (complete)2062915SAT 0.049992 0.056687
Sugar v1.14.6+minisat (complete)2062920SAT 0.98485 1.1282
Conquer 2009-07-10 (complete)2062921SAT 1.01084 1.20724
Sugar v1.14.6+picosat (complete)2062919SAT 1.03784 1.12886
Abscon 112v4 AC (complete)2094089SAT 1.59276 1.62921
Abscon 112v4 ESAC (complete)2094090SAT 1.75073 1.77542
SAT4J CSP 2.1.1 (complete)2062913SAT 1.78073 1.82288
Concrete DC 2009-07-14 (complete)2062917SAT 2.14067 1.85609
Concrete 2009-07-14 (complete)2062916SAT 2.76158 2.48439
Choco2.1.1 2009-06-10 (complete)2062918SAT 3.9144 3.97821
bpsolver 09 (complete)2062923SAT 4.17736 4.215
Choco2.1.1b 2009-07-16 (complete)2114956SAT 8.5757 8.62552

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 0 1 0 0 1 0 1 0 1 1 0 0 0 1 1 0 1 1 1 0 0 0 0 1 0 1 1 1 0 0 1 0 0 1 0 0 0 0 1 0 0 1 1 1 1 0 1 0 1 1 1 1 1 0 0 0 1 0 1 1 1 0 1 0 0 1 1 0 0
1 0 0 0 0 1 1 1 0 1 1 1 1 1 1 1 0 0 0 0 0 0 0 1 1 1 0 1 1 1