CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/ortholatin/
normalized-ortholatin-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/ortholatin/
normalized-ortholatin-7.xml
MD5SUMecb6f233f61e5d259266e5fb1cd34725
Bench CategoryAlldiff (alldiff)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark9.42557
Satisfiable
(Un)Satisfiability was proved
Number of variables147
Number of constraints78
Maximum constraint arity49
Maximum domain size49
Number of constraints which are defined in extension49
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)alldifferent(29)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Abscon 112v4 ESAC (complete)2094080SAT 9.42557 9.53429
Concrete 2009-07-14 (complete)2062861SAT 32.843 33.0699
Concrete DC 2009-07-14 (complete)2062862SAT 43.2024 43.6663
Sugar v1.14.6+minisat (complete)2062865SAT 57.3593 58.0304
Abscon 112v4 AC (complete)2094079SAT 81.9255 82.7318
Sugar v1.14.6+picosat (complete)2062864SAT 435.392 435.339
SAT4J CSP 2.1.1 (complete)2062858SAT 734.884 735.115
Mistral 1.545 (complete)2062867SAT 1207.39 1209.36
bpsolver 09 (complete)2062868? (TO) 1800.04 1813.51
Choco2.1.1 2009-06-10 (complete)2062863? (TO) 1800.04 1801.03
Choco2.1.1b 2009-07-16 (complete)2114951? (TO) 1800.12 1816.43

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
1 2 3 4 5 6 7 2 6 4 1 7 3 5 3 5 6 2 1 7 4 4 1 2 7 3 5 6 5 3 7 6 4 1 2 6 7 1 5 2 4 3 7 4 5 3 6 2 1 6 3 4 1 2 5 7 7 1 2 5 6 3 4 1 5 7 6 4 2 3
4 2 5 3 7 1 6 3 6 1 4 5 7 2 2 4 3 7 1 6 5 5 7 6 2 3 4 1 6 10 18 22 30 40 49 14 36 23 5 48 17 32 15 33 42 13 4 44 24 25 2 12 45 21 29 41 31
20 43 39 26 7 9 37 46 3 35 8 27 19 47 28 34 16 38 11 1