CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rcpsp/
normalized-rcpsp25-21.xml

Jump to solvers results

General information on the benchmark

Namecsp/rcpsp/
normalized-rcpsp25-21.xml
MD5SUMe53b72205c38da480122d378dd832b4a
Bench CategoryAlldiff+Cumul+Elt+WSum (alldiff,cumulative,element,weightedsum)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.360945
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints48
Maximum constraint arity25
Maximum domain size27
Number of constraints which are defined in extension0
Number of constraints which are defined in intension45
Global constraints used (with number of constraints)cumulative(3)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2060294SAT 0.360945 0.371005
Mistral 1.545 (complete)2060293SAT 0.829873 0.83715
Sugar v1.14.6+minisat (complete)2060291SAT 1.86971 1.96126
Sugar v1.14.6+picosat (complete)2060290SAT 2.16467 2.25808
Choco2.1.1b 2009-07-16 (complete)2114717SAT 33.3779 33.5855
Choco2.1.1 2009-06-10 (complete)2060289SAT 1772.74 1774.07

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 3 5 3 5 7 5 9 0 9 8 13 9 16 17 20 11 12 9 13 22 17 22 21 17