CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/coloring/
normalized-geom-30a-6-ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/coloring/
normalized-geom-30a-6-ext.xml
MD5SUM23948995bccd5483bc394fbac5577b6d
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.008998
Satisfiable
(Un)Satisfiability was proved
Number of variables30
Number of constraints81
Maximum constraint arity2
Maximum domain size6
Number of constraints which are defined in extension81
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2059468SAT 0.008998 0.0180499
pcs-restart 0.3.2 (complete)2059461SAT 0.017996 0.025329
pcs 0.3.2 (complete)2059460SAT 0.019996 0.0257349
bpsolver 09 (complete)2059469SAT 0.036994 0.0446541
Conquer 2009-07-10 (complete)2059467SAT 0.539917 0.72127
SAT4J CSP 2.1.1 (complete)2059459SAT 0.544916 0.68368
Choco2.1.1b 2009-07-16 (complete)2114642SAT 0.562913 0.51958
Sugar v1.14.6+picosat (complete)2059465SAT 0.592909 0.59513
Choco2.1.1 2009-06-10 (complete)2059464SAT 0.615905 0.673829
Sugar v1.14.6+minisat (complete)2059466SAT 0.6489 0.715413
Abscon 112v4 ESAC (complete)2093462SAT 0.71889 0.731859
Abscon 112v4 AC (complete)2093461SAT 0.769882 0.838275
Concrete 2009-07-14 (complete)2059462SAT 0.937856 1.00612
Concrete DC 2009-07-14 (complete)2059463SAT 0.960853 0.979616

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 5 0 4 1 2 3 0 5 2 4 2 4 3 2 5 1 1 5 2 0 2 4 3 2 1 1 0 3 5