CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/coloring/
normalized-geom-40-6-ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/coloring/
normalized-geom-40-6-ext.xml
MD5SUMe7fb6babb2b58367b36640bca885e427
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.007998
Satisfiable
(Un)Satisfiability was proved
Number of variables40
Number of constraints78
Maximum constraint arity2
Maximum domain size6
Number of constraints which are defined in extension78
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2059424SAT 0.007998 0.0106581
pcs-restart 0.3.2 (complete)2059417SAT 0.018996 0.0255379
pcs 0.3.2 (complete)2059416SAT 0.018996 0.0258751
bpsolver 09 (complete)2059425SAT 0.033994 0.0346039
Choco2.1.1 2009-06-10 (complete)2059420SAT 0.554915 0.474833
Conquer 2009-07-10 (complete)2059423SAT 0.580911 0.759212
SAT4J CSP 2.1.1 (complete)2059415SAT 0.599908 0.65007
Choco2.1.1b 2009-07-16 (complete)2114638SAT 0.606906 0.632578
Sugar v1.14.6+minisat (complete)2059422SAT 0.610907 0.731457
Sugar v1.14.6+picosat (complete)2059421SAT 0.623904 0.77169
Abscon 112v4 ESAC (complete)2093454SAT 0.71889 0.731856
Abscon 112v4 AC (complete)2093453SAT 0.722889 0.733597
Concrete DC 2009-07-14 (complete)2059419SAT 0.92086 0.976133
Concrete 2009-07-14 (complete)2059418SAT 0.996848 1.0443

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
4 5 0 3 4 2 4 4 4 5 0 1 5 0 0 0 1 0 5 4 5 5 1 3 2 4 5 4 0 3 2 3 5 2 5 4 5 0 1 0