CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/coloring/
normalized-geom-40-4-ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/coloring/
normalized-geom-40-4-ext.xml
MD5SUM0756896c8a80417c07a95efe8858fb66
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.005999
Satisfiable
(Un)Satisfiability was proved
Number of variables40
Number of constraints78
Maximum constraint arity2
Maximum domain size4
Number of constraints which are defined in extension78
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2059380UNSAT 0.005999 0.0149501
pcs-restart 0.3.2 (complete)2059373UNSAT 0.018996 0.0257921
pcs 0.3.2 (complete)2059372UNSAT 0.018996 0.0252891
bpsolver 09 (complete)2059381UNSAT 0.034994 0.043534
Choco2.1.1 2009-06-10 (complete)2059376UNSAT 0.457929 0.474784
Choco2.1.1b 2009-07-16 (complete)2114634UNSAT 0.496923 0.528566
SAT4J CSP 2.1.1 (complete)2059371UNSAT 0.546916 0.572307
Sugar v1.14.6+minisat (complete)2059378UNSAT 0.578911 0.755109
Conquer 2009-07-10 (complete)2059379UNSAT 0.600908 0.784343
Sugar v1.14.6+picosat (complete)2059377UNSAT 0.624904 0.785539
Abscon 112v4 AC (complete)2093445UNSAT 0.71989 0.748342
Abscon 112v4 ESAC (complete)2093446UNSAT 0.752885 0.795985
Concrete DC 2009-07-14 (complete)2059375UNSAT 0.963853 1.02029
Concrete 2009-07-14 (complete)2059374UNSAT 0.964852 0.998434

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: