CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/coloring/
normalized-geom-30a-5-ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/coloring/
normalized-geom-30a-5-ext.xml
MD5SUM7a6b06ef2be8f5292b87e3e5cd6ae261
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.009998
Satisfiable
(Un)Satisfiability was proved
Number of variables30
Number of constraints81
Maximum constraint arity2
Maximum domain size5
Number of constraints which are defined in extension81
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2059292UNSAT 0.009998 0.010819
pcs 0.3.2 (complete)2059284UNSAT 0.022995 0.0308
pcs-restart 0.3.2 (complete)2059285UNSAT 0.023995 0.0296341
bpsolver 09 (complete)2059293UNSAT 0.038993 0.04529
Choco2.1.1 2009-06-10 (complete)2059288UNSAT 0.488924 0.548833
Choco2.1.1b 2009-07-16 (complete)2114626UNSAT 0.504922 0.546357
Sugar v1.14.6+minisat (complete)2059290UNSAT 0.627904 0.752251
Conquer 2009-07-10 (complete)2059291UNSAT 0.653899 0.913037
Sugar v1.14.6+picosat (complete)2059289UNSAT 0.6559 0.764361
Abscon 112v4 AC (complete)2093429UNSAT 0.676896 0.736887
Abscon 112v4 ESAC (complete)2093430UNSAT 0.696893 0.7407
SAT4J CSP 2.1.1 (complete)2059283UNSAT 0.739887 0.763824
Concrete 2009-07-14 (complete)2059286UNSAT 0.972852 1.03035
Concrete DC 2009-07-14 (complete)2059287UNSAT 1.00485 0.926544

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: