CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/marc/
normalized-large-96-sat_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/marc/
normalized-large-96-sat_ext.xml
MD5SUM0832422d3adb16f478d8772816d8e677
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark18.1852
Satisfiable
(Un)Satisfiability was proved
Number of variables96
Number of constraints4560
Maximum constraint arity2
Maximum domain size96
Number of constraints which are defined in extension4560
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2059149SAT 18.1852 18.2671
Abscon 112v4 AC (complete)2093403SAT 22.6666 22.6888
Abscon 112v4 ESAC (complete)2093404SAT 22.8475 23.1095
pcs-restart 0.3.2 (complete)2059142SAT 46.4149 46.6178
pcs 0.3.2 (complete)2059141SAT 46.5629 46.6381
Concrete DC 2009-07-14 (complete)2059144SAT 94.7916 95.3211
Concrete 2009-07-14 (complete)2059143SAT 99.0889 100.214
SAT4J CSP 2.1.1 (complete)2059140SAT 138.797 139.539
Choco2.1.1b 2009-07-16 (complete)2114613? (problem) 35.9875 36.0646
Choco2.1.1 2009-06-10 (complete)2059145? (problem) 38.5541 38.7993
bpsolver 09 (complete)2059150? (problem) 559.128 560.459
Sugar v1.14.6+minisat (complete)2059147? (MO) 37 38.0504
Sugar v1.14.6+picosat (complete)2059146? (MO) 39.98 40.6682
Conquer 2009-07-10 (complete)2059148? (MO) 101.54 102.528

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7