CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/QCP-25/
normalized-qcp-25-264-12_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/QCP-25/
normalized-qcp-25-264-12_ext.xml
MD5SUMb3fd40cb3c979dcb57fec69fff68dd9c
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.492924
Satisfiable
(Un)Satisfiability was proved
Number of variables625
Number of constraints10142
Maximum constraint arity2
Maximum domain size25
Number of constraints which are defined in extension10142
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs 0.3.2 (complete)2058976UNSAT 0.492924 0.504053
pcs-restart 0.3.2 (complete)2058977UNSAT 1.12183 1.13989
Sugar v1.14.6+minisat (complete)2058982UNSAT 2.99654 3.15157
Sugar v1.14.6+picosat (complete)2058981UNSAT 4.02739 4.16826
Choco2.1.1 2009-06-10 (complete)2058980UNSAT 4.75428 4.81072
SAT4J CSP 2.1.1 (complete)2058975UNSAT 5.20421 5.26819
Choco2.1.1b 2009-07-16 (complete)2114598UNSAT 5.49216 5.37969
Mistral 1.545 (complete)2058984UNSAT 849.607 856.196
Abscon 112v4 AC (complete)2093373UNSAT 1554.45 1560.49
bpsolver 09 (complete)2058985? (TO) 1800.04 1806.11
Concrete DC 2009-07-14 (complete)2058979? (TO) 1800.06 1814.02
Conquer 2009-07-10 (complete)2058983? (TO) 1800.08 1806.82
Concrete 2009-07-14 (complete)2058978? (TO) 1800.08 1814.42
Abscon 112v4 ESAC (complete)2093374? (TO) 1800.09 1817.15

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: