CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/BH-4-4/
normalized-BlackHole-4-4-e-3_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/BH-4-4/
normalized-BlackHole-4-4-e-3_ext.xml
MD5SUMc9e14c4d2827f0a46f079b8e2d3e9047
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.024995
Satisfiable
(Un)Satisfiability was proved
Number of variables64
Number of constraints431
Maximum constraint arity2
Maximum domain size16
Number of constraints which are defined in extension431
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2058533UNSAT 0.024995 0.089404
pcs 0.3.2 (complete)2058525UNSAT 0.440932 0.448097
pcs-restart 0.3.2 (complete)2058526UNSAT 0.465929 0.469088
Choco2.1.1 2009-06-10 (complete)2058529UNSAT 0.725888 0.575744
Choco2.1.1b 2009-07-16 (complete)2114557UNSAT 0.746885 0.648991
Abscon 112v4 ESAC (complete)2093292UNSAT 0.841871 0.901683
Abscon 112v4 AC (complete)2093291UNSAT 0.842871 0.85226
Sugar v1.14.6+minisat (complete)2058531UNSAT 0.989849 1.14644
Sugar v1.14.6+picosat (complete)2058530UNSAT 1.01085 1.14831
SAT4J CSP 2.1.1 (complete)2058524UNSAT 2.02169 1.77769
Conquer 2009-07-10 (complete)2058532UNSAT 2.17967 2.38256
Concrete 2009-07-14 (complete)2058527UNSAT 2.46462 2.51481
Concrete DC 2009-07-14 (complete)2058528UNSAT 2.77558 2.84993
bpsolver 09 (complete)2058534? (TO) 1800.08 1812.51

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: