CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/BH-4-7/
normalized-BlackHole-4-7-e-8_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/BH-4-7/
normalized-BlackHole-4-7-e-8_ext.xml
MD5SUM4bffe1c84c3ac08270f47caf386cacb7
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.043993
Satisfiable
(Un)Satisfiability was proved
Number of variables112
Number of constraints1261
Maximum constraint arity2
Maximum domain size28
Number of constraints which are defined in extension1261
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2057807UNSAT 0.043993 0.047752
Abscon 112v4 ESAC (complete)2093160UNSAT 0.937857 0.790014
Choco2.1.1b 2009-07-16 (complete)2114491UNSAT 0.967852 0.807993
Abscon 112v4 AC (complete)2093159UNSAT 0.991848 1.06079
Choco2.1.1 2009-06-10 (complete)2057803UNSAT 1.13983 1.17608
Sugar v1.14.6+minisat (complete)2057805UNSAT 826.919 833.96
pcs-restart 0.3.2 (complete)2057800? 894.32 894.667
pcs 0.3.2 (complete)2057799? 921.441 925.954
Concrete 2009-07-14 (complete)2057801? (TO) 1800.04 1806.82
Concrete DC 2009-07-14 (complete)2057802? (TO) 1800.05 1808.72
bpsolver 09 (complete)2057808? (TO) 1800.05 1809.31
Sugar v1.14.6+picosat (complete)2057804? (TO) 1800.09 1810.22
Conquer 2009-07-10 (complete)2057806? (TO) 1800.11 1812.42
SAT4J CSP 2.1.1 (complete)2057798? (TO) 1800.74 1812.76

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: