CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-2-50-23/
normalized-rand-2-50-23-587-230-37_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-2-50-23/
normalized-rand-2-50-23-587-230-37_ext.xml
MD5SUM504bb3cfc5b77d445e8ef185c72f0228
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints485
Maximum constraint arity2
Maximum domain size23
Number of constraints which are defined in extension485
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Concrete DC 2009-07-14 (complete)2091055? (TO) 1800 1803.42
pcs 0.3.2 (complete)2091052? (TO) 1800.04 1811.92
Conquer 2009-07-10 (complete)2091059? (TO) 1800.05 1810.42
Concrete 2009-07-14 (complete)2091054? (TO) 1800.05 1809.12
Choco2.1.1 2009-06-10 (complete)2091056? (TO) 1800.07 1805.14
Sugar v1.14.6+minisat (complete)2091058? (TO) 1800.08 1812.92
bpsolver 09 (complete)2091061? (TO) 1800.09 1804.21
Mistral 1.545 (complete)2091060? (TO) 1800.11 1810.51
pcs-restart 0.3.2 (complete)2091053? (TO) 1800.11 1802.93
Sugar v1.14.6+picosat (complete)2091057? (TO) 1800.12 1806.62
Abscon 112v4 AC (complete)2099205? (TO) 1800.12 1809.63
Abscon 112v4 ESAC (complete)2099206? (TO) 1800.12 1805.55
Choco2.1.1b 2009-07-16 (complete)2117514? (TO) 1800.15 1801.45
SAT4J CSP 2.1.1 (complete)2091051? (TO) 1800.32 1807.15

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: