CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/os-taillard-10/
normalized-os-taillard-10-95-4.xml

Jump to solvers results

General information on the benchmark

Namecsp/os-taillard-10/
normalized-os-taillard-10-95-4.xml
MD5SUMd78e185ada4143a8ec3ca4accce3134e
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.247961
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints900
Maximum constraint arity2
Maximum domain size608
Number of constraints which are defined in extension0
Number of constraints which are defined in intension900
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2087640UNSAT 0.247961 0.253652
Choco2.1.1b 2009-07-16 (complete)2117203UNSAT 1.25381 1.30596
Choco2.1.1 2009-06-10 (complete)2087635UNSAT 1.54177 1.58816
Sugar v1.14.6+minisat (complete)2087637UNSAT 274.228 276.652
Sugar v1.14.6+picosat (complete)2087636UNSAT 551.894 557.193
SAT4J CSP 2.1.1 (complete)2087630? 359.616 362.171
pcs 0.3.2 (complete)2087631? 908.361 916.94
pcs-restart 0.3.2 (complete)2087632? (MO) 827.553 831.24
Concrete DC 2009-07-14 (complete)2087634? (TO) 1800.06 1807.02
Mistral 1.545 (complete)2087639? (TO) 1800.07 1800.91
Concrete 2009-07-14 (complete)2087633? (TO) 1800.1 1812.02
Abscon 112v4 ESAC (complete)2098584? (TO) 1800.12 1814.35
Abscon 112v4 AC (complete)2098583? (TO) 1800.13 1806.66

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: