CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/js-taillard-20/
normalized-js-taillard-20-95-3.xml

Jump to solvers results

General information on the benchmark

Namecsp/js-taillard-20/
normalized-js-taillard-20-95-3.xml
MD5SUM5fb5bb86e517eac69d25de7ca9766c14
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark122.097
Satisfiable
(Un)Satisfiability was proved
Number of variables400
Number of constraints4180
Maximum constraint arity2
Maximum domain size1582
Number of constraints which are defined in extension0
Number of constraints which are defined in intension4180
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Choco2.1.1 2009-06-10 (complete)2086722UNSAT 122.097 123.325
Sugar v1.14.6+minisat (complete)2086724UNSAT 1311.46 1317.46
Sugar v1.14.6+picosat (complete)2086723UNSAT 1332.58 1338.21
Choco2.1.1b 2009-07-16 (complete)2117120UNSAT 1390.37 1397.04
Concrete DC 2009-07-14 (complete)2086721? 159.385 160.939
SAT4J CSP 2.1.1 (complete)2086717? 328.343 329.784
Concrete 2009-07-14 (complete)2086720? (TO) 1800 1805.03
Mistral 1.545 (complete)2086726? (TO) 1800.06 1815.61
Abscon 112v4 AC (complete)2098417? (TO) 1800.08 1806.44
Abscon 112v4 ESAC (complete)2098418? (TO) 1800.09 1807.95
pcs 0.3.2 (complete)2086718? (TO) 1800.09 1815.14
bpsolver 09 (complete)2086727? (TO) 1800.1 1808.81
pcs-restart 0.3.2 (complete)2086719? (TO) 1800.11 1803.75

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: