MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/composed-25-1-25/
normalized-composed-25-1-25-8_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/composed-25-1-25/
normalized-composed-25-1-25-8_ext.xml
MD5SUM884862f000072deb6d486ed9fd9a52c7
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints2
Best CPU time to get the best result obtained on this benchmark0.225965
Satisfiable
(Un)Satisfiability was proved
Number of variables33
Number of constraints247
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension247
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2 2008-06-271114278OPTIMUM2 0.225965 0.238121
toulbar2/BTD 2008-06-271114277OPTIMUM2 0.39194 0.416388
Sugar++ v1.13+minisat-inc1114275OPTIMUM2 2.5886 2.80017
Sugar v1.13+minisat1114276OPTIMUM2 2.97555 3.16526
AbsconMax 112 pc-w1114273OPTIMUM2 465.236 1132.67
AbsconMax 112 pc-d1114274MSAT (TO)2 1592.23 4000.04
Concrete + CSP4J - Tabu Engine 2008-05-301114272MSAT (TO)2 3600.02 3621.82
Concrete + CSP4J - MCRW Engine 2008-05-301114271MSAT (TO)2 3600.09 3601.52

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 2
Solution found:
3 0 0 0 1 0 4 7 0 6 5 4 0 0 5 1 3 3 1 9 1 1 0 4 3 3 2 7 2 6 7 5 8