MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/os-taillard-7/
normalized-os-taillard-7-95-4.xml

Jump to solvers results

General information on the benchmark

Namecsp/os-taillard-7/
normalized-os-taillard-7-95-4.xml
MD5SUM177eee84193169191528b6c3ca4d0ae0
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints3
Best CPU time to get the best result obtained on this benchmark8.85665
Satisfiable
(Un)Satisfiability was proved
Number of variables49
Number of constraints294
Maximum constraint arity2
Maximum domain size392
Number of constraints which are defined in extension0
Number of constraints which are defined in intension294
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
Sugar++ v1.13+minisat-inc1113915OPTIMUM3 8.85665 9.18721
Sugar v1.13+minisat1113916OPTIMUM3 13.43 14.0049
AbsconMax 112 pc-d1113914MSAT (TO)6 1599.45 4000.06
AbsconMax 112 pc-w1113913MSAT (TO)6 1600.58 4000.04
Concrete + CSP4J - MCRW Engine 2008-05-301113911MSAT (TO)6 3600.08 3601.82
Concrete + CSP4J - Tabu Engine 2008-05-301113912MSAT (TO)6 3600.09 3605.62

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 3
Solution found:
6 154 244 92 289 266 315 174 108 167 17 239 375 313 2 101 339 174 6 226 181 253 333 227 198 307 44 105 101 74 1 186 219 143 300 1 182 67 263
325 227 143 12 167 4 128 238 302 92