MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/dubois/
normalized-dubois-27_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/dubois/
normalized-dubois-27_ext.xml
MD5SUM9bbcd0d053c7f22553dc7618dca10bd4
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints1
Best CPU time to get the best result obtained on this benchmark0.049992
Satisfiable
(Un)Satisfiability was proved
Number of variables81
Number of constraints54
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension54
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2/BTD 2008-06-271110621OPTIMUM1 0.049992 0.055881
Sugar++ v1.13+minisat-inc1110619OPTIMUM1 1.2918 1.50869
Sugar v1.13+minisat1110620OPTIMUM1 1.3238 1.54497
toulbar2 2008-06-271110622OPTIMUM1 25.7991 26.0278
Concrete + CSP4J - MCRW Engine 2008-05-301110615MSAT (TO)1 3600.05 3634.12
Concrete + CSP4J - Tabu Engine 2008-05-301110616MSAT (TO)1 3600.1 3630.52
AbsconMax 112 pc-d1110618MSAT (TO)1 3600.11 3601.94
AbsconMax 112 pc-w1110617MSAT (TO)1 3600.14 3601.87

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 1
Solution found:
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 0 1