MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/coloring/
normalized-geom-40-2-ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/coloring/
normalized-geom-40-2-ext.xml
MD5SUM1cc053dec3f0d112864f71ec4f7b5d96
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints22
Best CPU time to get the best result obtained on this benchmark0.029995
Satisfiable
(Un)Satisfiability was proved
Number of variables40
Number of constraints78
Maximum constraint arity2
Maximum domain size2
Number of constraints which are defined in extension78
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2 2008-06-271108542OPTIMUM22 0.029995 0.0359159
toulbar2/BTD 2008-06-271108541OPTIMUM22 0.030994 0.0360611
Sugar v1.13+minisat1108540OPTIMUM22 396.059 398.908
Sugar++ v1.13+minisat-inc1108539OPTIMUM22 780.585 785.812
AbsconMax 112 pc-w1108537OPTIMUM22 1387.6 3391.25
AbsconMax 112 pc-d1108538MSAT (TO)22 1637.14 4000.06
Concrete + CSP4J - Tabu Engine 2008-05-301108536MSAT (TO)22 3600 3630.82
Concrete + CSP4J - MCRW Engine 2008-05-301108535MSAT (TO)22 3600.04 3602.42

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 22
Solution found:
0 0 1 0 1 0 1 1 0 1 1 0 0 1 0 0 0 1 0 1 0 0 1 0 0 0 1 1 0 0 1 1 1 1 1 0 0 0 0 0