CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
dimacs/pret/
pret-60-75_ext.xml

Jump to solvers results

General information on the benchmark

Namedimacs/pret/
pret-60-75_ext.xml
MD5SUM5373c097d76184877d5eaffb3c2cb383
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.024995
SatisfiableNO
(Un)Satisfiability was proved
Number of variables60
Number of constraints40
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension40
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
CSPtoSAT+minisat 0.3241877UNSAT 0.024995 0.0304781
sugar 0.40241876UNSAT 0.459929 0.807792
galacJ beta 1241860UNSAT 0.634903 0.681964
galac 1241871UNSAT 0.697893 0.860167
Abscon 109 AC241868UNSAT 0.999847 1.02328
SAT4JCSP-CACHED 1.7 RC BF3241872UNSAT 1.08183 0.94578
sat4jCSP 1.7 RC BF3241873UNSAT 1.13683 1.15951
Abscon 109 ESAC241867UNSAT 1.35179 1.41066
Mistral 2006-12-04241874UNSAT 24.2263 24.3977
Tramontane 2006-12-04241875UNSAT 89.7244 90.1937
BPrologCSPSolver70a 2006-12-13241858UNSAT 190.544 191.264
CSP4J - MAC 2006-12-19241870UNSAT 235.601 237.077
CSP4J - MAC 2007-01-16272723UNSAT 251.889 252.083
CSP4J - Combo 2006-12-19241869UNSAT 1654.49 1655.33