CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
dimacs/pret/
pret-150-40_ext.xml

Jump to solvers results

General information on the benchmark

Namedimacs/pret/
pret-150-40_ext.xml
MD5SUM3a52a800eac841971a0879ee4e43203a
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.045992
SatisfiableNO
(Un)Satisfiability was proved
Number of variables150
Number of constraints100
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension100
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
CSPtoSAT+minisat 0.3241855UNSAT 0.045992 0.0550969
sugar 0.40241854UNSAT 0.083986 0.972141
galacJ beta 1241838UNSAT 0.769882 0.786637
galac 1241849UNSAT 0.821874 0.870042
sat4jCSP 1.7 RC BF3241851UNSAT 1.25781 1.30464
SAT4JCSP-CACHED 1.7 RC BF3241850UNSAT 1.41878 1.21643
Abscon 109 AC241846UNSAT 29.8985 30.2418
Abscon 109 ESAC241845UNSAT 640.591 641.022
CSP4J - MAC 2006-12-19241848? (TO) 1800 1808.79
Tramontane 2006-12-04241853? (TO) 1800.03 1808.48
CSP4J - MAC 2007-01-16272722? (TO) 1800.04 1802.41
CSP4J - Combo 2006-12-19241847? (TO) 1800.07 1800.99
Mistral 2006-12-04241852? (TO) 1800.08 1800.81
BPrologCSPSolver70a 2006-12-13241836? (TO) 1800.12 1800.87