CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
taillard/
os-taillard-10/os-taillard-10-95-6.xml

Jump to solvers results

General information on the benchmark

Nametaillard/
os-taillard-10/os-taillard-10-95-6.xml
MD5SUM376c4d5b9e80417bbb3a28982bb1287e
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark24.3523
SatisfiableNO
(Un)Satisfiability was provedNO
Number of variables100
Number of constraints900
Maximum constraint arity2
Maximum domain size585
Number of constraints which are defined in extension0
Number of constraints which are defined in intension900
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
sugar 0.40235524UNSAT 24.3523 24.525
SAT4JCSP-CACHED 1.7 RC BF3235518? 331.148 332.185
sat4jCSP 1.7 RC BF3235519? 474.615 476.134
galac 1235516? (problem) 265.057 266.511
galacJ beta 1235511? (problem) 272.374 272.444
VALCSP 3.1269515? (MO) 107.223 107.739
VALCSP 3.0235517? (MO) 107.398 108.373
CSP4J - MAC 2007-01-16272307? (TO) 1800.02 1800.74
BPrologCSPSolver70a 2006-12-13235510? (TO) 1800.03 1809.67
CSPtoSAT+minisat 0.3235525? (TO) 1800.05 1801.85
CSP4J - MAC 2006-12-19235515? (TO) 1800.06 1814.55
CSP4J - Combo 2006-12-19235514? (TO) 1800.07 1809.03
Mistral 2006-12-04235522? (TO) 1800.09 1803.08
Abscon 109 ESAC235512? (TO) 1800.09 1804.39
Tramontane 2006-12-04235523? (TO) 1800.1 1807.49
buggy_2_5_s 2007-01-08235520? (TO) 1800.12 1808.49
Abscon 109 AC235513? (TO) 1800.12 1802.07
buggy_2_5 2007-01-08235521? (TO) 1800.14 1814.02