CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
pseudoSeries/
ii/ii-8a2.xml

Jump to solvers results

General information on the benchmark

NamepseudoSeries/
ii/ii-8a2.xml
MD5SUMcdb711692b39602e2fb9440cf33f4648
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.090985
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables360
Number of constraints980
Maximum constraint arity8
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension980
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 2006-12-04215243SAT 0.090985 0.097593
Tramontane 2006-12-04215244SAT 0.095984 0.103361
CSPtoSAT+minisat 0.3215246SAT 0.351946 0.361454
sugar 0.40215245SAT 1.05 1.40387
Abscon 109 ESAC215236SAT 1.12283 1.18337
Abscon 109 AC215237SAT 1.3178 1.35214
CSP4J - MAC 2007-01-16271228SAT 1.87571 1.90671
CSP4J - MAC 2006-12-19215239SAT 2.02469 2.07338
galacJ beta 1215235SAT 2.58461 2.7096
galac 1215240SAT 2.74458 2.82902
CSP4J - Combo 2006-12-19215238SAT 2.94655 3.02508
sat4jCSP 1.7 RC BF3215242SAT 3.57946 3.65573
SAT4JCSP-CACHED 1.7 RC BF3215241SAT 4.32434 4.42263
BPrologCSPSolver70a 2006-12-13215234SAT 1564.96 1577.51